Installation Day Guide

How to Prepare for Your Water System Installation

A little prep goes a long way. Follow these four simple steps before your Rock Water & Co technician arrives and we'll have your new system up and running as fast as possible.

4 Simple Steps

What to Do Before We Arrive

Most of these take less than 10 minutes. Doing them the evening before your appointment is ideal.

🧴
🗑️
🧹
🧽
🪣
Clear This Out
Empty cabinet = faster install
01
Do this the night before

Clear Under the Kitchen Sink

Remove all cleaning supplies, trash cans, and any clutter stored under your kitchen sink. Your installer needs full, unobstructed access to the cabinet to connect your new system.

  • Move cleaning products to another cabinet temporarily
  • Remove any trash cans or recycling bins
  • Clear out sponges, dish soap, and other items
  • Wipe out any moisture or spills from the cabinet floor
WATER
HEATER
3 ft clearance needed
Keep this area clear
02
If getting a water softener

Clear the Utility / Water Heater Area

If your installation includes a water softener, clear a 3×3 ft area near your water heater or main water line. The softener unit needs room to sit and be connected to your plumbing.

  • Move boxes, storage bins, or seasonal items out of the way
  • Ensure the main water shut-off valve is visible and accessible
  • Clear at least 3 feet of floor space around the install area
  • Note where your floor drain is — the softener will need it nearby
Check before install day
Standard 120V outlet needed
03
Required for RO systems with a pump

Check for a Nearby Electrical Outlet

Reverse osmosis systems sometimes require a power source for the pump. Before your appointment, check whether there is an accessible electrical outlet under the sink or within reach of the install area.

  • Look for an outlet inside or directly below the sink cabinet
  • Check if the outlet is functional — plug in a phone charger to test
  • If no outlet exists under the sink, note the nearest one
  • Let your installer know in advance if outlet access is limited
Typical Install Day
Arrival
Technician arrives & assesses
~15 min
Water shut off begins
1–3 hrs
System installed & tested
Done
Water restored & running
04
Avoid running water 30 min before arrival

Plan for Temporary Water Shutoff

Your installer will need to shut off your home's water supply briefly during the installation. Plan ahead so your household is prepared — this typically lasts 30–60 minutes.

  • Have someone 18 or older home for the entire appointment
  • Avoid running the dishwasher or laundry right before the appointment
  • Fill a pitcher of water beforehand if needed for drinking
  • Let family members know water will be off temporarily
Print or Screenshot This

Day-Of Checklist

Run through this list the morning of your appointment.

Cabinet under sink is cleared out
Utility/water heater area has 3 ft of clearance
Electrical outlet location noted (for RO systems)
Someone 18+ will be home all day
Dishwasher & laundry not running before arrival
Main water shut-off valve location is known
Pitcher of water filled for drinking during shutoff
On Install Day

What Happens When We Arrive

Here's a general timeline so you know exactly what to expect from start to finish.

👋
Arrival

Technician Arrives & Introduces Themselves

We'll confirm the scope of work, walk through your home's water situation, and answer any last-minute questions before starting.

🔍
~15 min

Site Assessment

Your technician inspects the install locations, checks plumbing connections, and confirms the system placement before any work begins.

🔧
30–60 min

Water Shut Off & Installation Begins

We'll shut off your water supply and begin the installation. This is the main work phase — most installs take 1–3 hours total depending on system type.

🧪
Near End

System Testing & Water Quality Check

Once installed, we run the system, check for leaks, and test your water to confirm everything is working perfectly before we leave.

Done!

Walkthrough & Care Instructions

We'll walk you through how your new system works, what maintenance it needs, and answer any questions. You'll have clean, filtered water from day one.

Someone 18+ Must Be Home

An adult (18 or older) must be present for the entire installation appointment. This is required to authorize work, answer questions, and receive the system walkthrough at the end. If you need to reschedule, please call us at least 24 hours in advance.

Questions Before Your Install?

Our team is happy to walk you through anything before your appointment day. Give us a call — we're available Monday through Saturday, 7am–7pm.